Home » Power Plant, Metsä Fibre, Kemi, Finland

Power Plant, Metsä Fibre, Kemi, Finland

Metsä Fibre is building a new Bio Product Mill in Kemi, Finland. The construction work started in 2021  and will be taken into use in 2023.

Challenges

° Detail Engineering, Procurement, Prefabrication and Installation of the HP-Piping

° Demanding HP-Piping

° High qualiinstallationty standard and strict requirements

° Short period

° Remote site location in Northern Finland, partly winter installation

° Global Covid 19 pandemic presence

Solutions

° High prefabrication rate was used for shortening lead time and reducing needed manpower at site

° Recion’s own wide  recourses in close internal co-operation

° Disciplines: power piping

° Lifespan: execution period 2022 – 2023

° Size: pipe weight approx. 200 tons