Rothensee WtE plant, Müllheizkraftwerk Rothensee GmbH

Rothensee WtE plant, run by Müllheizkraftwerk Rothensee GmbH (owned by the SWM Städtishe Werke Magdeburg GmbH and EEW Energy from Waste GmbH), is a  waste combustion plant of 650.000 tons/a that produces electricity and district heating and started it’s operations in 2005. Now a third block equipped with latest Martin’s technology will be built beside the existing 2 units. Operation of the 3rd Unit will start in 2024.

Challenges

° Engineering, procurement, prefabrication and installation of the boiler house piping

° Limited amount of space as the new boiler is built in the same place as the two older ones

° Demanding HP- and LP-Piping

° High quality standard and strict requirements

Solutions

° High prefabrication rate was used for shortening lead time and reducing needed manpower at site

° Disciplines: process piping

° Lifespan: execution period Q4/2022 – Q4/2023

° Size: pipe length approx. 2 000 m